Your data doesn't train Genie's AI
You keep IP ownership of your information
1. Document Control: Document version, revision history, and approval status
2. Project Information: Basic details about the project, location, and scope of work
3. Responsible Parties: Details of key personnel, their roles and responsibilities in implementing the RAMS
4. Work Description: Detailed description of the work activities to be carried out
5. Risk Assessment Methodology: Explanation of risk assessment approach and scoring system used
6. Hazard Identification: Comprehensive list of identified hazards associated with the work
7. Risk Assessment Matrix: Evaluation of risks, their likelihood and severity, before and after control measures
8. Control Measures: Detailed preventive and protective measures to be implemented
9. Method Statement: Step-by-step description of how work will be carried out safely
10. Equipment and Materials: List of equipment, tools, and materials to be used, including safety specifications
11. Personal Protective Equipment: Required PPE for different activities and proper usage instructions
12. Emergency Procedures: Emergency response plans and evacuation procedures
13. Training Requirements: Required qualifications and training for personnel involved
14. Monitoring and Review: Procedures for monitoring compliance and reviewing effectiveness of RAMS
1. Environmental Protection Measures: Required when work has significant environmental impacts
2. Noise and Vibration Assessment: Needed for work involving loud equipment or vibrating machinery
3. Working at Height Procedures: Required for any work conducted above ground level
4. Confined Space Entry: Necessary when work involves entering confined spaces
5. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic
6. Hazardous Substances Control: Needed when work involves dangerous chemicals or materials
7. Waste Management Procedures: Required for projects generating significant waste
8. Weather Conditions Assessment: Important for outdoor work or weather-dependent activities
1. Risk Assessment Forms: Standardized forms used for risk assessment documentation
2. Safety Data Sheets: Technical information for hazardous materials used
3. Equipment Inspection Checklists: Forms for regular equipment safety checks
4. Training Records: Documentation of worker qualifications and training
5. Emergency Contact Information: List of emergency contacts and procedures
6. Site Plans and Drawings: Relevant technical drawings and site layouts
7. Permits and Licenses: Copies of required work permits and certifications
8. Incident Report Forms: Templates for reporting accidents or near-misses
Assessment Date
Competent Person
Control Measure
Critical Risk
Emergency Procedure
Hazard
Hazard Identification
Health and Safety Plan
High Risk Activity
Incident
Job Safety Analysis
Likelihood
Method Statement
Must
Near Miss
Personal Protective Equipment (PPE)
Principal Contractor
Probability
Project Site
Reasonably Practicable
Residual Risk
Risk
Risk Assessment
Risk Control
Risk Level
Risk Matrix
Risk Rating
Safe System of Work
Safety Data Sheet
Severity
Shall
Should
Site Rules
Supervisor
Task
Toolbox Talk
Work Activity
Work Area
Work Method
Working Environment Representative
Workplace
Project Information
Roles and Responsibilities
Risk Assessment
Hazard Identification
Safety Measures
Work Methodology
Equipment Requirements
Training Requirements
Emergency Procedures
Environmental Protection
Personal Protective Equipment
Site Rules
Monitoring and Review
Incident Reporting
First Aid Arrangements
Communication Procedures
Quality Control
Compliance Requirements
Documentation Requirements
Construction
Manufacturing
Mining
Oil and Gas
Renewable Energy
Chemical Industry
Transportation
Logistics
Utilities
Telecommunications
Maritime
Infrastructure
Healthcare
Waste Management
Agriculture
Food Processing
Health and Safety
Operations
Risk Management
Quality Assurance
Project Management
Compliance
Environmental Health
Technical Operations
Site Operations
Emergency Response
Facilities Management
Production
Legal
Human Resources
Health and Safety Manager
Project Manager
Risk Assessment Specialist
Safety Coordinator
Site Supervisor
Operations Manager
Compliance Officer
Environmental Health and Safety Officer
Quality Control Manager
Construction Manager
Production Supervisor
Facility Manager
Safety Engineer
Technical Director
Work Environment Coordinator
Risk Management Consultant
Find the exact document you need
Risk Assessment Questionnaire
Danish-law compliant Risk Assessment Questionnaire for comprehensive workplace hazard identification and evaluation.
Cyber Threat Assessment
Danish law-governed Cyber Threat Assessment agreement establishing framework for cybersecurity evaluation services, ensuring compliance with Danish and EU regulations.
Fraud Risk Assessment For Banks
A regulatory-compliant fraud risk assessment document for banking operations in Denmark, addressing key operational risks and control measures under Danish and EU financial regulations.
Regulatory Compliance Risk Assessment
A detailed assessment of organizational compliance with Danish and EU regulatory requirements, identifying compliance risks and providing recommendations for improvement.
Livery Yard Risk Assessment
A Danish-compliant risk assessment document for livery yard operations, addressing safety and regulatory requirements under Danish law.
Risk Assessment Policy
A Danish-compliant policy document outlining organizational risk assessment procedures and requirements under Danish workplace safety legislation.
Cyber Security Assessment
Danish law-governed Cyber Security Assessment agreement establishing framework for security evaluations with GDPR compliance.
Risk Assessment Methodology
Danish-law compliant methodology for systematic workplace risk assessment and management, aligned with national safety regulations and EU directives.
Risk Assessment Cyber Security
A Danish law-compliant cybersecurity risk assessment document analyzing digital security risks and providing mitigation recommendations under Danish and EU regulatory frameworks.
Coshh Assessment Form
A mandatory Danish workplace safety document for assessing and controlling risks associated with hazardous substances, compliant with Danish and EU regulations.
Rapid Risk Assessment
A Danish law-compliant document for swift identification and assessment of workplace risks, with immediate action planning and control measures.
Model Risk Assessment
A regulatory-compliant assessment document under Danish law that evaluates and documents risks associated with financial and business models used in regulated entities.
Building Risk Assessment
A legally compliant Danish construction risk assessment document that identifies and addresses potential hazards in building projects, aligned with Danish and EU safety regulations.
Area Risk Assessment
A structured evaluation of workplace hazards and safety measures compliant with Danish regulations and EU safety directives.
Risk Self Assessment
A Danish law-compliant document for systematic workplace risk identification, assessment, and management.
Organisational Risk Assessment
A Danish law-compliant document that assesses and documents organizational risks, providing analysis and mitigation strategies in accordance with Danish regulatory requirements.
Threat Vulnerability Assessment
A Danish law-compliant security assessment document analyzing organizational vulnerabilities and providing remediation recommendations in accordance with national and EU regulations.
Business Case Risk Assessment
A Danish law-compliant risk assessment document analyzing potential business case risks and providing mitigation strategies and monitoring frameworks.
Data Breach Assessment
A comprehensive data breach analysis and response document compliant with Danish and EU data protection laws.
Demolition Risk Assessment
A Danish-compliant risk assessment document for demolition projects, addressing safety hazards and environmental impacts under Danish regulations.
Cybersecurity Risk Assessment Matrix
A Danish law-compliant framework for systematically assessing and managing organizational cybersecurity risks, aligned with local and EU regulations.
Vendor Risk Assessment Questionnaire
Danish law-compliant vendor risk assessment questionnaire for evaluating supplier risk profiles and regulatory compliance.
High Level Risk Assessment
A comprehensive risk evaluation document compliant with Danish law, analyzing and addressing organizational operational, environmental, and safety risks.
Vulnerability Assessment Matrix
A Danish-compliant security assessment document that systematically evaluates and documents IT infrastructure vulnerabilities and their recommended mitigation strategies.
Asset Criticality Assessment
A Danish law-compliant document that assesses and documents the criticality level of organizational assets, incorporating local and EU regulatory requirements.
Financial Crime Risk Assessment
A Danish law-compliant assessment document analyzing an organization's financial crime risks and control frameworks, aligned with EU regulations.
Startup Risk Assessment
A comprehensive risk assessment document for startups operating under Danish jurisdiction, evaluating legal, operational, financial, and technological risks while ensuring compliance with Danish and EU regulations.
Site Specific Risk Assessment And Method Statement
A Danish-compliant safety document combining risk assessment and method statements for specific work sites, ensuring compliance with Danish Working Environment regulations.
Bank Compliance Risk Assessment
A mandatory compliance risk evaluation document for banks operating in Denmark, assessing regulatory risks and controls under Danish and EU banking laws.
Raw Material Supplier Risk Assessment
A Danish law-governed document for assessing and managing risks associated with raw material suppliers, ensuring compliance with local and EU regulations.
Compliance Risk Assessment Questionnaire
A structured compliance risk assessment tool aligned with Danish regulatory requirements for evaluating organizational compliance risks and developing mitigation strategies.
Workplace Assessment
A mandatory Danish workplace safety and health evaluation document that assesses and addresses all significant work environment risks and conditions.
Last Minute Risk Assessment
A Danish-compliant document for conducting immediate pre-task risk assessments, ensuring workplace safety through systematic hazard evaluation and control measures.
Factory Risk Assessment
A legally compliant risk assessment document for factory operations under Danish law, identifying hazards and establishing safety protocols.
Emergency Lighting Risk Assessment
A Danish law-compliant technical assessment evaluating emergency lighting systems against national and EU standards, including risk analysis and improvement recommendations.
Document Control Risk Assessment
A risk assessment of document control systems and processes, aligned with Danish regulatory requirements and EU standards.
Criticality Assessment Matrix
A Danish law-governed framework for systematically assessing and categorizing business function criticality and associated risks within organizations.
Business Continuity Assessment
A Danish law-governed assessment document evaluating an organization's capability to maintain critical operations during disruptions, including risk analysis and improvement recommendations.
Asset Management Risk Assessment
A Danish-law compliant risk assessment document for asset management activities, addressing key risks and regulatory requirements under Danish and EU financial regulations.
Country Risk Assessment
A Danish law-compliant Country Risk Assessment document analyzing political, economic, legal, and security risks for business operations in a specific country.
Daily Risk Assessment
A Danish-compliant daily workplace risk assessment tool for systematic hazard identification and risk control, aligned with national and EU safety regulations.
Process Risk Assessment
A regulatory-compliant risk assessment document under Danish law that identifies, analyzes, and provides control measures for process-related hazards and risks.
Dust Risk Assessment
A Danish regulatory-compliant assessment document analyzing workplace dust exposure risks, control measures, and safety recommendations.
Technical Risk Assessment
A Danish-compliant technical risk assessment document for identifying, analyzing, and mitigating operational risks under Danish and EU regulations.
Environmental Risk Assessment Matrix
A structured environmental risk assessment tool compliant with Danish and EU environmental regulations, used for evaluating and managing environmental impacts in Denmark.
Flooring Risk Assessment
A Danish-law compliant risk assessment document for evaluating and managing flooring-related hazards and safety measures in accordance with national and EU regulations.
Individual Risk Assessment
Danish-law compliant template for conducting and documenting individual workplace risk assessments, aligned with Working Environment Act requirements.
Hazard Vulnerability Assessment
A Danish law-compliant assessment document analyzing organizational hazards, vulnerabilities, and risks, with recommendations for risk mitigation.
Audit Risk Assessment
A Danish-compliant audit planning document that assesses engagement risks and determines audit approach in accordance with Danish audit regulations and ISA standards.
Manual Handling Risk Assessment
A Danish law-compliant workplace safety document that assesses and addresses risks associated with manual handling operations, as required by the Danish Working Environment Act.
Risk Management Assessment
A Danish law-compliant Risk Management Assessment document evaluating organizational risks and control measures while ensuring regulatory compliance.
Supply Chain Risk Assessment
A Danish law-compliant framework for assessing and managing supply chain risks, incorporating local regulatory requirements and risk mitigation strategies.
Security Assessment Report
A Danish law-compliant security evaluation document that assesses organizational security posture and provides recommendations for improvement, adhering to Danish and EU regulatory requirements.
Supplier Risk Assessment
A Danish law-compliant supplier risk assessment template for evaluating and documenting supplier-related risks and compliance requirements.
Fire Risk Assessment
A mandatory fire safety evaluation document under Danish law that assesses fire risks and safety measures for properties and facilities.
Workplace Risk Assessment
Danish-compliant workplace risk assessment document for systematic evaluation of workplace hazards and safety measures under Danish Working Environment Act.
Simple Risk Assessment
A Danish law-compliant workplace risk assessment document for identifying and managing occupational hazards and safety measures.
Threat Vulnerability Risk Assessment
A Danish-law compliant security assessment document identifying organizational threats, vulnerabilities, and risks, with recommended mitigation strategies.
Third Party Risk Assessment
A Danish law-governed document for evaluating and managing risks associated with third-party business relationships, ensuring regulatory compliance and risk mitigation.
Risk Assessment And Method Statement
A Danish law-compliant document outlining workplace risk assessment and safe working procedures, meeting requirements of the Danish Working Environment Act.
Forklift Risk Assessment
A Danish-compliant risk assessment document for forklift operations, addressing safety requirements under Danish Working Environment regulations.
Risk Assessment Report
A Danish-compliant workplace risk assessment report identifying and analyzing workplace hazards, with control measures and recommendations aligned with Danish regulations.
Activity Based Risk Assessment Form
A Danish-compliant workplace safety document for systematic risk assessment and control of specific work activities, meeting local regulatory requirements.
Risk Assessment Plan
A legally required Danish workplace safety document that identifies, analyzes, and establishes control measures for organizational risks and hazards.
Business Continuity Plan Risk Assessment
A Danish law-compliant risk assessment document for evaluating and addressing potential threats to business continuity, aligned with both national and EU regulatory requirements.
IT Risk Assessment Report
A technical assessment document analyzing IT-related risks and compliance status under Danish and EU regulations, providing recommendations for risk mitigation and control improvements.
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it