Risk Assessment And Method Statement Template for Singapore

Generate a bespoke document

What is a Risk Assessment And Method Statement?

The Risk Assessment And Method Statement Template is a crucial document required under Singapore's workplace safety regulations. It serves as a systematic approach to identifying and controlling workplace hazards before work begins. The template is designed to comply with the Workplace Safety and Health Act and related regulations, providing a structured methodology for risk assessment, control measures, and safe work procedures. This document is essential for companies operating in Singapore to demonstrate due diligence in workplace safety management and maintain compliance with local regulatory requirements.

Trusted by high-performance teams

Reviewed by

Swetha Meenal

Legal Engineer, GenieAI

Swetha Meenal profile photo

A lawyer, legal researcher and legal tech founder, Swetha has built AI products deployed inside Tier 1 firms and enterprises. She ensures GenieAI's alignment with the latest regulation and executes testing on the legal robustness of Genie output.

Reviewed by

Imad Mohammed Nazar

Legal Engineer, GenieAI

Imad Mohammed Nazar profile photo

A Skadden-trained M&A lawyer, Imad advised on cross-border transactions and contractual risk before moving into legal AI. He reviews GenieAI's output for compliance and enforceability across our 150+ supported jurisdictions, as well as facilitating external benchmarking.

Jurisdiction

Singapore

Publisher

GenieAI

Sector

Business

Cost

Free to use

Last updated

About the Risk Assessment And Method Statement

A Risk Assessment And Method Statement (RAMS) is a comprehensive safety document that combines hazard identification with detailed work procedures to ensure workplace safety compliance in Singapore. You need this document to systematically evaluate risks and establish safe working methods before any project begins, meeting your legal obligations under local workplace safety regulations.

When do you need this document?

You must prepare a Risk Assessment And Method Statement before commencing any work activity that poses potential safety risks in Singapore. This includes construction projects, maintenance work, chemical handling operations, confined space entry, work at height, and any activity involving machinery or hazardous materials. The document is particularly crucial for high-risk industries such as construction, manufacturing, marine operations, and oil and gas sectors. You also need RAMS documentation when engaging contractors or subcontractors, as it demonstrates your commitment to safety management and helps establish clear safety responsibilities across all parties involved in the project.

Key legal considerations

Your Risk Assessment And Method Statement must include comprehensive hazard identification covering all workplace risks, from physical hazards like falls and machinery to chemical, biological, and ergonomic risks. The document requires a detailed risk evaluation matrix that assesses both likelihood and severity of identified hazards using standardized risk assessment methodologies. You must specify control measures following the hierarchy of controls, prioritizing elimination and substitution over personal protective equipment. The method statement section should provide step-by-step safe work procedures, emergency response protocols, and clear assignment of safety responsibilities to project managers, safety officers, site supervisors, and workers. Regular review and updating provisions are essential, as risk assessments must remain current throughout the project lifecycle.

Legal requirements in Singapore

Under Singapore's Workplace Safety and Health Act, you have a legal duty to conduct risk assessments and implement appropriate control measures to ensure workplace safety. The Workplace Safety and Health (Risk Management) Regulations specifically mandate systematic risk assessment processes and require documented evidence of risk management implementation. Your RAMS must comply with the Code of Practice on Workplace Safety and Health Risk Management, which provides detailed guidance on assessment methodologies and control measure selection. The Ministry of Manpower's Technical Advisories offer additional industry-specific requirements that may apply to your particular sector. You must ensure your risk assessment team includes qualified personnel, maintain records of all assessments, and provide adequate training to workers on identified risks and control measures. Failure to conduct proper risk assessments can result in significant penalties and legal liability under Singapore law.

GOVERNING LAW

Applicable law

This Risk Assessment And Method Statement is drafted to comply with Singapore law. Key legislation includes:

Workplace Safety and Health Act (WSHA): Primary legislation governing workplace safety and health in Singapore, providing the framework for regulating safety standards across all industries

Workplace Safety and Health (Risk Management) Regulations: Specific regulations detailing requirements for conducting risk assessments and implementing risk management systems in workplaces

Workplace Safety and Health (General Provisions) Regulations: General regulations covering basic workplace safety requirements applicable across different industries

Code of Practice on Workplace Safety and Health Risk Management: Practical guidelines and standards for implementing risk management processes in accordance with WSH regulations

Technical Advisories from Ministry of Manpower: Official guidance documents providing specific safety requirements and best practices for various workplace scenarios

Singapore Standards (SS): National standards providing detailed technical specifications and guidelines for industry-specific safety requirements

Construction Regulations: Specific regulations governing safety requirements in the construction industry, including building works and construction site management

Manufacturing Safety Requirements: Specific safety standards and procedures applicable to manufacturing operations and processes

Chemical Handling Regulations: Requirements for safe storage, handling, and disposal of chemicals in workplace environments

Environmental Protection and Management Act: Legislation governing environmental protection aspects that may impact workplace safety and health procedures

Fire Safety Act: Requirements for fire safety measures and emergency procedures in workplaces

Work Injury Compensation Act: Legal framework for compensation in case of work-related injuries, influencing risk assessment considerations

ISO 45001: International standard for Occupational Health and Safety Management Systems, providing guidelines for systematic safety management

Further Risk Assessment Document documents

Genie's Security Promise

Genie is the safest place to draft. Here's how we prioritise your privacy and security.

Your data is private:

We do not train on your data; Genie's AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it

Ready to agree with confidence?
See Genie in action.