Scaffold Risk Assessment And Method Statement Template for Australia

Generate a bespoke document

What is a Scaffold Risk Assessment And Method Statement?

The Scaffold Risk Assessment And Method Statement is a crucial document required under Australian Work Health and Safety legislation for any project involving scaffolding work. It serves as both a safety management tool and a procedural guide, ensuring compliance with Work Health and Safety Act 2011, associated regulations, and relevant Australian Standards (AS/NZS 1576 and 4576). This document is mandatory for high-risk construction work involving scaffolding and must be prepared before work commencement. It combines systematic risk assessment with detailed work procedures, ensuring all hazards are identified and controlled, while providing clear guidance for safe work practices. The document must be regularly reviewed and updated to reflect any changes in site conditions or work methods.

Trusted by high-performance teams

Reviewed by

Swetha Meenal

Legal Engineer, GenieAI

Swetha Meenal profile photo

A lawyer, legal researcher and legal tech founder, Swetha has built AI products deployed inside Tier 1 firms and enterprises. She ensures GenieAI's alignment with the latest regulation and executes testing on the legal robustness of Genie output.

Reviewed by

Imad Mohammed Nazar

Legal Engineer, GenieAI

Imad Mohammed Nazar profile photo

A Skadden-trained M&A lawyer, Imad advised on cross-border transactions and contractual risk before moving into legal AI. He reviews GenieAI's output for compliance and enforceability across our 150+ supported jurisdictions, as well as facilitating external benchmarking.

Jurisdiction

Australia

Publisher

GenieAI

Sector

Business

Cost

Free to use

Last updated

About the Scaffold Risk Assessment And Method Statement

A Scaffold Risk Assessment And Method Statement is your essential compliance document for any scaffolding work in Australia. This comprehensive document combines risk assessment with detailed work procedures, ensuring you meet your legal obligations under the Work Health and Safety Act 2011 while protecting workers and the public from scaffolding-related hazards.

When do you need this document?

You must prepare this document before commencing any scaffolding work classified as high-risk construction work under Australian legislation. This includes erecting scaffolding over 2 metres high, suspended scaffolding, scaffolding near powerlines, or work involving cantilever or hung scaffolding systems. Principal contractors require this document before allowing scaffolding contractors on site, and WorkSafe inspectors will request it during compliance audits. The document is also necessary when applying for construction permits, engaging scaffolding subcontractors, or when client contracts specify detailed safety documentation.

Key legal considerations

Your risk assessment must systematically identify all potential hazards including falls, structural collapse, electrical hazards, and weather-related risks. The method statement section must detail specific work procedures, emergency response plans, and competency requirements for all personnel. You must clearly define responsibilities for the principal contractor, scaffolding contractor, site manager, and safety personnel. The document must specify required qualifications, including high-risk work licenses for scaffolding, and detail inspection schedules throughout the project lifecycle. Equipment specifications must comply with Australian Standards, and you must include contingency plans for adverse weather or emergency situations.

Legal requirements in Australia

Under the Work Health and Safety Act 2011, you have a primary duty of care to ensure workplace safety, with specific obligations for high-risk construction work involving scaffolding. The Work Health and Safety Regulation 2011 requires detailed risk assessments and safe work method statements for all high-risk activities. Your scaffolding must comply with AS/NZS 1576 standards covering design, materials, and installation requirements, while AS/NZS 4576 provides additional safety guidelines. Personnel must hold appropriate high-risk work licenses as specified in the National Code of Practice for High Risk Work. You must follow the Managing the Risk of Falls at Workplaces Code of Practice for fall prevention measures. Regular inspections by competent persons are mandatory, with inspection records forming part of your compliance documentation. State and territory WorkSafe authorities have enforcement powers and can issue improvement or prohibition notices for non-compliance.

Further Risk Assessment Document documents

Genie's Security Promise

Genie is the safest place to draft. Here's how we prioritise your privacy and security.

Your data is private:

We do not train on your data; Genie's AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it

Ready to agree with confidence?
See Genie in action.