Scaffold Risk Assessment And Method Statement Template for Indonesia
Generate a bespoke document
What is a Scaffold Risk Assessment And Method Statement?
The Scaffold Risk Assessment And Method Statement is a crucial safety document required under Indonesian occupational safety regulations for any project involving scaffolding work. This document is mandated by Law No. 1 of 1970 and subsequent regulations, serving as a comprehensive safety management tool that combines risk evaluation with detailed work procedures. It must be prepared before any scaffolding work commences and requires regular updates to reflect changing site conditions or work requirements. The document addresses specific Indonesian regulatory requirements while incorporating international best practices in scaffold safety management, making it essential for ensuring worker safety and legal compliance in construction and industrial projects throughout Indonesia.
Trusted by high-performance teams
About the Scaffold Risk Assessment And Method Statement
You need a Scaffold Risk Assessment And Method Statement when undertaking any scaffolding work in Indonesia to comply with occupational safety laws and protect workers from serious injuries. This document combines two critical safety components: a systematic evaluation of potential hazards and detailed procedures for safe work execution. Under Indonesian law, this assessment must be completed before scaffolding operations begin and serves as your primary tool for demonstrating regulatory compliance to authorities.
When do you need this document?
You must prepare this document whenever your project involves erecting, altering, or dismantling scaffolding structures. This includes temporary scaffolding for building construction, maintenance work on existing structures, industrial plant operations, and infrastructure projects. The document is required regardless of scaffold height or complexity, as Indonesian regulations mandate risk assessments for all scaffolding activities. You'll also need to update this document when site conditions change, new hazards are identified, or work procedures are modified during the project.
Key legal considerations
Your scaffold risk assessment must identify all potential hazards including falls from height, structural collapse, electrical contact, and material handling risks. You need to evaluate each hazard's likelihood and potential severity, then specify control measures to eliminate or minimize risks. The method statement section must detail step-by-step procedures for scaffold erection, inspection, use, and dismantling. Critical elements include load calculations, foundation requirements, fall protection systems, and emergency procedures. You must ensure all personnel involved in scaffolding work are competent and properly trained according to the documented procedures.
Legal requirements in Indonesia
Indonesian Law No. 1 of 1970 establishes the fundamental requirement for workplace safety documentation, while Minister of Manpower Regulation No. PER.01/MEN/1980 provides specific scaffolding safety requirements. Your document must comply with SNI 1727:2020 standards for structural loading calculations and design requirements. Under Regulation No. 05/PRT/M/2014, you must implement a Safety and Health Management System that includes this risk assessment as a core component. The document requires approval from your designated Safety Officer and must be available on-site for inspection by authorities. Regular reviews and updates are mandatory to maintain compliance, with documented evidence of ongoing risk management throughout the project lifecycle.
GOVERNING LAW
Applicable law
This Scaffold Risk Assessment And Method Statement is drafted to comply with Indonesia law. Key legislation includes:
Minister of Manpower Regulation No. PER.01/MEN/1980: Specific regulation concerning Occupational Safety and Health in Construction Works, which includes detailed requirements for scaffolding safety and inspection procedures.
SNI 1727:2020: Indonesian National Standard for minimum loads for building design and structures, which includes requirements for scaffold loading calculations and structural integrity.
Regulation of the Minister of Public Works No. 05/PRT/M/2014: Regulations on Occupational Safety and Health Management Systems (SMK3) in Construction Work, which covers risk assessment requirements and safety management procedures.
Minister of Manpower Regulation No. PER.08/MEN/VII/2010: Regulation on Personal Protective Equipment, specifying the requirements for safety equipment that must be used during scaffolding work.
Government Regulation No. 50 of 2012: Regulation on the Implementation of Occupational Safety and Health Management Systems, which provides framework for risk assessment and safety documentation.
Minister of Manpower Regulation No. PER.09/MEN/VII/2010: Regulation concerning Work at Heights Safety, which includes specific requirements for working on scaffolds and fall protection systems.
Further Risk Assessment Document documents
Explore 208,390+ legal templates
Explore 208,390+ legal templates
Genie's Security Promise
Genie is the safest place to draft. Here's how we prioritise your privacy and security.
Your data is private:
We do not train on your data; Genie's AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it