Risk Assessment Plan For (Construction) Template for New Zealand

Create a bespoke document in minutes,  or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Risk Assessment Plan For (Construction)

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Risk Assessment Plan For (Construction)

"I need a Risk Assessment Plan For (Construction) for a 20-story commercial building project in downtown Auckland, starting March 2025, with particular emphasis on crane operations and working at height, plus specific protocols for managing risks during the predicted heavy rainfall season."

Document background
The Risk Assessment Plan For (Construction) is a crucial document required under New Zealand's Health and Safety at Work Act 2015 and associated regulations. It is mandatory for construction projects and must be prepared before commencing any significant construction work. The document serves multiple purposes: ensuring legal compliance, protecting worker safety, managing project risks, and establishing clear protocols for risk management. It must be tailored to specific project requirements while maintaining compliance with New Zealand's regulatory framework, including WorkSafe guidelines and industry standards. The plan typically requires regular updates throughout the project lifecycle and must be accessible to all relevant stakeholders, including workers, supervisors, and safety representatives.
Suggested Sections

1. 1. Introduction: Overview of the project, scope of works, and purpose of the risk assessment plan

2. 2. Project Details: Specific information about the construction project, location, timeline, and key stakeholders

3. 3. Definitions and Terminology: Clear definitions of technical terms, risk categories, and assessment criteria used in the document

4. 4. Roles and Responsibilities: Detailed outline of who is responsible for risk assessment, management, and implementation of controls

5. 5. Risk Assessment Methodology: Description of the risk assessment process, scoring systems, and evaluation criteria

6. 6. Hazard Identification: Comprehensive list of potential hazards specific to the construction project

7. 7. Risk Analysis and Evaluation: Detailed analysis of identified risks, their likelihood, and potential consequences

8. 8. Risk Control Measures: Specific control measures for each identified risk following the hierarchy of controls

9. 9. Emergency Response Procedures: Procedures for handling emergencies and incidents

10. 10. Monitoring and Review: Process for ongoing monitoring, reviewing, and updating the risk assessment

11. 11. Training Requirements: Specific training needs for workers related to identified risks and control measures

12. 12. Documentation and Record Keeping: Requirements for maintaining risk assessment records and related documentation

Optional Sections

1. Site-Specific Environmental Controls: Required when the project has significant environmental impacts or requires resource consent

2. Hazardous Substances Management: Required when the project involves handling or storage of hazardous materials

3. Public Safety Measures: Required for construction sites in populated areas or with public access considerations

4. Traffic Management Plan Integration: Required when construction activities impact public roads or require traffic management

5. Specialized Equipment Risk Assessment: Required when project involves use of specialized or high-risk construction equipment

6. Subcontractor Management: Required when multiple subcontractors are involved in the project

7. Heritage Site Considerations: Required when working on or near heritage-listed sites

8. Cultural Safety Considerations: Required when working on culturally significant sites or areas

Suggested Schedules

1. Schedule 1: Risk Assessment Matrix: Detailed risk assessment scoring matrix and evaluation criteria

2. Schedule 2: Hazard Register Template: Standard template for recording and tracking identified hazards

3. Schedule 3: Control Measure Checklist: Comprehensive checklist of required control measures

4. Schedule 4: Emergency Contact Information: List of emergency contacts and response procedures

5. Schedule 5: Incident Report Forms: Standard forms for reporting incidents and near-misses

6. Appendix A: Site Layout Plans: Detailed site plans marking hazard zones and control measures

7. Appendix B: Safe Work Method Statements: Detailed procedures for high-risk construction activities

8. Appendix C: Training Records Template: Template for recording worker training and competencies

9. Appendix D: Legal Compliance Checklist: Checklist ensuring compliance with relevant legislation and standards

10. Appendix E: Risk Assessment Review Log: Template for documenting periodic reviews and updates

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions
Clauses
Relevant Industries

Construction

Infrastructure Development

Commercial Building

Residential Construction

Industrial Construction

Civil Engineering

Mining and Resources

Property Development

Public Works

Environmental Services

Relevant Teams

Health and Safety

Project Management

Operations

Quality Assurance

Risk Management

Compliance

Construction Operations

Site Management

Environmental Management

Legal and Regulatory Affairs

Relevant Roles

Construction Manager

Health and Safety Coordinator

Project Manager

Site Supervisor

Risk Assessment Officer

Compliance Manager

Construction Director

Safety Inspector

Environmental Officer

Operations Manager

Quality Assurance Manager

Construction Superintendent

Site Safety Representative

Project Engineer

Contract Administrator

Industries
Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Risk Assessment Plan For (Construction)

A legally mandated document under New Zealand law that outlines the approach to identifying and managing construction-related risks and safety measures.

find out more

Modern Slavery Risk Management Plan

A structured plan for managing modern slavery risks in operations and supply chains under New Zealand law and international best practices.

find out more

Risk Management Plan In Project Proposal

A structured plan for managing project risks in accordance with New Zealand legislation and risk management standards, outlining risk assessment, treatment, and monitoring procedures.

find out more

Risk Management Proposal

A New Zealand-compliant proposal outlining comprehensive risk management strategies, assessment methodologies, and implementation plans for organizational risk management.

find out more

Project Proposal Risk Management

A New Zealand-compliant document that outlines the risk management framework and strategies for project proposals, integrating risk assessment with project planning requirements.

find out more

Risk Assessment For Business Plan

A structured risk assessment document for business plans that identifies and analyzes potential risks while ensuring compliance with New Zealand regulatory requirements.

find out more

Traffic Management Plan Risk Assessment

A New Zealand-compliant risk assessment document that identifies and addresses safety hazards in temporary traffic management operations, following CoPTTM requirements.

find out more

Safety Risk Assessment And Management Plan

A legally compliant safety risk assessment and management framework for New Zealand workplaces, aligned with the Health and Safety at Work Act 2015.

find out more

Risk Assessment Plan

A structured plan for identifying and managing organizational risks, compliant with New Zealand's Health and Safety regulations and industry standards.

find out more

Business Continuity Plan Risk Assessment

A risk assessment document for business continuity planning that complies with New Zealand regulations and identifies, analyzes, and provides mitigation strategies for potential business interruption risks.

find out more

Risk Assessment Action Plan

A New Zealand-compliant workplace safety document that outlines risk assessment findings and specific action plans for managing identified hazards under NZ health and safety legislation.

find out more

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.