Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Pipeline Right Of Way Agreement
"I need a Pipeline Right of Way Agreement for a 50km natural gas pipeline project in Eastern Province, Saudi Arabia, scheduled to begin construction in March 2025, with standard Saudi Aramco technical specifications and crossing primarily through industrial zones."
1. Parties: Identification of the grantor (landowner/authority) and grantee (pipeline operator)
2. Background: Context of the agreement, including project overview and purpose
3. Definitions: Key terms used throughout the agreement, including technical and legal terminology
4. Grant of Right of Way: Specific rights being granted, including dimensions, location, and scope of the pipeline corridor
5. Term and Renewal: Duration of the agreement and conditions for renewal
6. Consideration and Payment: Compensation structure, payment terms, and any periodic fees
7. Rights and Obligations of the Grantee: Pipeline operator's responsibilities, including construction, maintenance, and safety obligations
8. Rights and Obligations of the Grantor: Landowner's continuing rights and restrictions within the right of way area
9. Construction and Installation: Requirements and standards for pipeline construction and installation
10. Maintenance and Repairs: Ongoing maintenance obligations and procedures for repairs
11. Environmental Protection: Environmental compliance requirements and protection measures
12. Safety and Security: Safety standards, security measures, and emergency procedures
13. Insurance and Liability: Insurance requirements and allocation of risks
14. Default and Termination: Events of default, remedies, and termination procedures
15. Governing Law and Dispute Resolution: Applicable Saudi law and dispute resolution mechanisms
1. Multiple Landowners Provisions: Required when the pipeline crosses multiple properties, detailing coordination and collective rights
2. Cultural Heritage Protection: Needed when the pipeline route affects areas of cultural or historical significance
3. Special Environmental Provisions: Required for environmentally sensitive areas or protected zones
4. Crossing Agreements: When the pipeline intersects with other infrastructure or utilities
5. Agricultural Land Protection: Specific provisions for agricultural land preservation and restoration
6. Community Impact Provisions: Required when pipeline affects local communities, including social responsibility measures
7. Government Approval Conditions: Special conditions imposed by government authorities
8. Force Majeure Extended Provisions: Detailed force majeure terms for high-risk areas
1. Schedule 1 - Pipeline Route and Coordinates: Detailed maps and coordinates of the pipeline route
2. Schedule 2 - Technical Specifications: Pipeline specifications, materials, and construction standards
3. Schedule 3 - Land Details: Property details, dimensions, and existing encumbrances
4. Schedule 4 - Compensation Schedule: Detailed breakdown of compensation and payment terms
5. Schedule 5 - Construction Timeline: Project timeline and construction milestones
6. Schedule 6 - Environmental Management Plan: Detailed environmental protection measures and monitoring requirements
7. Schedule 7 - Emergency Response Procedures: Emergency protocols and contact information
8. Appendix A - Required Permits and Approvals: List of necessary governmental and regulatory approvals
9. Appendix B - Insurance Requirements: Detailed insurance specifications and coverage requirements
10. Appendix C - Standard Operating Procedures: Maintenance and operation protocols
Authors
Applicable Laws
Commencement Date
Compensation
Construction Period
Corridor
Easement
Effective Date
Environmental Laws
Force Majeure
Governmental Authority
Grantor
Grantee
HCIS Requirements
Land
Maintenance
Operating Period
Pipeline
Pipeline Activities
Pipeline Facilities
Pipeline Route
Premises
Property
Regulatory Approvals
Right of Way
Right of Way Area
Saudi Aramco Standards
Security Requirements
Site
Specifications
Term
Technical Standards
Work
Working Area
Access Rights
Ancillary Rights
As-Built Drawings
Commercial Operation Date
Crossing Points
Emergency
Environmental Impact Assessment
Environmental Management Plan
Hazardous Materials
Insurance Requirements
Interface Points
Permits
Related Rights
Safety Standards
Surface Rights
Underground Rights
Grant of Rights
Term and Renewal
Consideration and Payment
Land Use Rights
Access Rights
Construction Rights
Maintenance Rights
Technical Requirements
Environmental Compliance
Health and Safety
Insurance
Indemnification
Force Majeure
Assignment
Confidentiality
Dispute Resolution
Governing Law
Termination
Property Rights
Regulatory Compliance
Emergency Response
Security Requirements
Warranties
Notices
Entire Agreement
Severability
Amendments
Third Party Rights
Counterparts
Land Registration
Compensation
Liability
Safety Standards
Environmental Protection
Restoration Obligations
Inspection Rights
Crossing Rights
Interference Prevention
Default Provisions
Remedies
Oil and Gas
Energy
Infrastructure
Utilities
Industrial Development
Real Estate
Environmental Services
Construction
Transportation
Legal
Land Management
Engineering
Environmental
Project Management
Operations
Health Safety Environment
Compliance
Real Estate
Construction
Facilities Management
Technical Services
Contract Administration
Legal Counsel
Land Manager
Pipeline Engineer
Environmental Compliance Officer
Project Manager
Rights of Way Specialist
Property Manager
Construction Manager
HSE Manager
Operations Director
Facilities Manager
Compliance Officer
Contract Administrator
Real Estate Manager
Technical Director
Find the exact document you need
Reciprocal Easement Agreement
A Saudi Arabian law-governed agreement establishing mutual property access and usage rights between property owners, compliant with Sharia principles and local regulations.
Pipeline Right Of Way Agreement
A Saudi Arabian agreement granting rights to construct and operate pipelines across specified land areas, incorporating local regulatory requirements and technical specifications.
Cross Easement Agreement
A Sharia-compliant agreement under Saudi Arabian law establishing mutual property access rights and obligations between property owners.
Easement Contract
A Sharia-compliant legal agreement under Saudi Arabian law granting specific rights to use or access another party's property.
Drainage Easement Agreement
A Saudi Arabian legal agreement establishing drainage easement rights and obligations between property owners and beneficiaries, compliant with local laws and Shariah principles.
Perpetual Right Of Way Agreement
A Saudi Arabian law-governed agreement establishing permanent access rights over land, creating an enduring easement that complies with local regulations and Sharia principles.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.