Site Specific Risk Assessment And Method Statement Template for Nigeria

A Site Specific Risk Assessment and Method Statement (RAMS) document tailored for the Nigerian regulatory environment, incorporating requirements from the Nigerian Labour Act, Factories Act, and relevant state-specific safety regulations. This comprehensive document outlines the systematic approach to identifying workplace hazards, assessing associated risks, and establishing detailed control measures for specific work activities. It includes step-by-step procedures for safe work execution, resource requirements, emergency protocols, and compliance with local health and safety standards while incorporating international best practices.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With Genie AI:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Site Specific Risk Assessment And Method Statement?

The Site Specific Risk Assessment And Method Statement (RAMS) is a fundamental document required under Nigerian health and safety regulations, particularly the Factories Act and Labour Act. It serves as a crucial tool for identifying and mitigating workplace risks while providing detailed methodologies for safe work execution. This document is mandatory for most construction and industrial projects in Nigeria, especially those involving high-risk activities or significant safety considerations. The RAMS must be prepared before work commencement and requires regular updates to reflect changing site conditions or work methodologies. It combines risk assessment principles with practical work procedures, ensuring compliance with both federal and state-specific safety requirements while protecting workers and assets.

What sections should be included in a Site Specific Risk Assessment And Method Statement?

1. Document Control Information: Document reference number, revision history, and approval status

2. Project Information: Site address, project description, scope of works, and key stakeholders

3. Site Description: Detailed description of the site, including access points, existing structures, and environmental conditions

4. Risk Assessment Methodology: Explanation of risk assessment approach, risk matrix, and scoring system used

5. Hazard Identification: Comprehensive list of identified hazards associated with the work

6. Risk Assessment: Detailed assessment of each identified hazard, including likelihood and severity ratings

7. Control Measures: Specific control measures for each identified risk

8. Method Statement: Step-by-step description of how the work will be carried out safely

9. Resource Requirements: Personnel, equipment, and materials needed for the work

10. PPE Requirements: Detailed list of required Personal Protective Equipment

11. Training Requirements: Specific training and competency requirements for personnel

12. Emergency Procedures: Emergency response plans and procedures

13. Communication Plan: Details of how safety information will be communicated to workers

What sections are optional to include in a Site Specific Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Required when work has significant environmental implications

2. Noise Assessment: Required for works involving high noise levels

3. Traffic Management Plan: Required when work affects public roads or site traffic

4. Confined Space Entry Procedures: Required for works involving confined space entry

5. Working at Height Procedures: Required for works involving activities at height

6. Lifting Operations Plan: Required when crane or lifting operations are involved

7. Hazardous Substances Assessment: Required when handling dangerous or hazardous materials

8. Night Work Procedures: Required for works conducted during night hours

What schedules should be included in a Site Specific Risk Assessment And Method Statement?

1. Risk Assessment Matrix: Detailed risk scoring matrix and assessment criteria

2. Site Layout Plans: Drawings showing site layout, access points, and work areas

3. Equipment Certificates: Copies of relevant equipment certification and inspection records

4. Training Records: Copies of relevant personnel training certificates

5. Emergency Contact List: List of emergency contacts and key personnel

6. Permit to Work Forms: Templates for any required work permits

7. Daily Inspection Checklists: Templates for daily safety inspections

8. Toolbox Talk Templates: Templates for safety briefings and toolbox talks

9. Incident Report Forms: Templates for reporting accidents and incidents

10. Material Safety Data Sheets: MSDS for any hazardous materials being used

Authors

Alex Denne

Head of Growth (Open Source Law) @ Genie AI | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Nigeria

Publisher

Genie AI

Cost

Free to use

Find the exact document you need

Coshh Assessment Form

A Nigerian-compliant assessment form for evaluating and controlling risks associated with hazardous substances in the workplace, aligned with the Factories Act and safety regulations.

Download

Severity Risk Assessment Matrix

A risk assessment framework compliant with Nigerian regulations for evaluating and categorizing operational risks based on severity and likelihood.

Download

Risk Maturity Assessment Report

A detailed assessment of organizational risk management maturity and capabilities, prepared in compliance with Nigerian regulatory requirements and international standards.

Download

Risk Identification Form

A regulatory-compliant risk assessment document for Nigerian organizations to identify, evaluate, and plan risk management strategies in accordance with local laws.

Download

Risk Evaluation Form

A standardized risk assessment document compliant with Nigerian regulations for identifying and evaluating workplace hazards and implementing control measures.

Download

Risk Assessment Matrix Oil And Gas

A structured risk assessment framework for oil and gas operations in Nigeria, ensuring compliance with local regulations while providing comprehensive risk evaluation and mitigation strategies.

Download

Quality Risk Assessment SOP

A comprehensive SOP for quality risk assessment processes compliant with Nigerian NAFDAC requirements and international standards.

Download

Risk Assessment SOP

A Standard Operating Procedure for conducting risk assessments in compliance with Nigerian legislation and safety regulations.

Download

Hazard Assessment Process

A Nigerian-compliant hazard assessment process document outlining procedures for workplace hazard identification, evaluation, and control measures.

Download

Basic Risk Assessment Matrix

A structured risk assessment framework compliant with Nigerian regulations, designed for systematic identification and management of organizational risks.

Download

First Aid Needs Assessment Form

A structured assessment form for evaluating workplace first aid requirements and provisions under Nigerian health and safety regulations.

Download

AML CFT Risk Assessment Report

A Nigerian law-compliant assessment report analyzing an organization's money laundering and terrorist financing risks, control effectiveness, and recommended improvements.

Download

Risk Assessment Letter

A formal risk evaluation document compliant with Nigerian regulations that identifies, analyzes, and provides mitigation strategies for business or project-related risks.

Download

Risk Assessment Form Project Management

A Nigerian-compliant project management risk assessment form for systematic risk identification, analysis, and mitigation in accordance with local regulations.

Download

E Signature Risk Assessment

A risk assessment framework for e-signature implementation in Nigeria, addressing legal compliance, technical security, and operational risks under Nigerian law.

Download

Construction Risk Assessment Report

A technical report compliant with Nigerian regulations that assesses and provides mitigation strategies for construction project risks.

Download

Project Risk Assessment

A comprehensive risk assessment document compliant with Nigerian law that identifies, analyzes, and provides mitigation strategies for project-related risks.

Download

RFP Risk Assessment

A Nigerian-law compliant risk assessment document for analyzing and mitigating potential risks in RFP processes.

Download

Project Assessment Matrix

A comprehensive project evaluation tool aligned with Nigerian regulatory requirements for assessing project viability, risks, and compliance across multiple dimensions.

Download

Site Security Assessment Report

A detailed security evaluation document compliant with Nigerian regulations that assesses site vulnerabilities and provides security enhancement recommendations.

Download

Diesel Coshh Assessment

A Nigerian-compliant hazard assessment document for managing risks associated with diesel fuel handling and storage.

Download

Baseline Risk Assessment

A systematic evaluation of workplace hazards and risks compliant with Nigerian safety regulations, providing control measures and risk management strategies.

Download

Vulnerability Assessment Matrix

A structured framework for assessing and documenting security vulnerabilities in Nigerian organizations, aligned with local cybersecurity regulations and best practices.

Download

Method Statement And Risk Assessment For Landscaping

A Nigerian-compliant method statement and risk assessment document outlining safe procedures and control measures for landscaping operations.

Download

Hazard Identification Form

A comprehensive workplace hazard identification and assessment tool compliant with Nigerian safety regulations and workplace safety requirements.

Download

Procurement Risk Assessment Matrix

A structured risk assessment tool for procurement processes in Nigeria, aligned with local procurement laws and regulations.

Download

Scaffold Risk Assessment And Method Statement

A Nigerian-compliant safety and methodology document for scaffold operations, incorporating risk assessment and detailed work procedures in accordance with local regulations.

Download

Tile Manual Handling Risk Assessment

A risk assessment document for tile handling operations compliant with Nigerian safety regulations, detailing hazards, control measures, and safety recommendations.

Download

Standard Risk Assessment Matrix

A structured risk assessment framework compliant with Nigerian regulations, providing systematic risk evaluation and mitigation guidelines.

Download

Site Specific Risk Assessment And Method Statement

A comprehensive risk assessment and method statement document compliant with Nigerian safety regulations, detailing workplace hazards, control measures, and safe work procedures.

Download

Preliminary Risk Assessment Audit

A Nigerian law-governed preliminary assessment document evaluating organizational risks and providing initial recommendations for risk management and compliance.

Download

Compliance Risk Assessment Questionnaire

A comprehensive compliance risk assessment tool aligned with Nigerian regulatory requirements, enabling organizations to evaluate their compliance status and identify potential risks.

Download

Manual Handling Risk Assessment Tool

A comprehensive Manual Handling Risk Assessment Tool aligned with Nigerian workplace safety regulations, designed to evaluate and control manual handling risks in various workplace settings.

Download

Financial Statement Risk Assessment

A Nigerian law-compliant assessment document that evaluates risks in financial statements and reporting processes, providing risk mitigation recommendations.

Download

Emergency Preparedness Risk Assessment

A systematic evaluation of potential emergency risks and response strategies, compliant with Nigerian regulations and NEMA guidelines.

Download

Criticality Assessment Matrix

A risk assessment framework document for Nigerian organizations to evaluate and prioritize operational, safety, and business risks in compliance with local regulations.

Download

Environmental Risk Assessment Matrix

A structured environmental risk assessment framework compliant with Nigerian environmental regulations, designed to evaluate and manage environmental impacts of projects and operations.

Download

Design Risk Assessment

A technical-legal document for evaluating and managing design-related risks in Nigerian construction and development projects, complying with local regulations and safety standards.

Download

Generic Risk Assessment

A comprehensive workplace risk assessment document compliant with Nigerian safety and labor regulations, designed to identify and mitigate potential hazards in the workplace.

Download

Security Assessment Report

A detailed security assessment report document compliant with Nigerian cybersecurity laws, providing comprehensive analysis of organizational security posture and improvement recommendations.

Download
See more related templates

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it