Corporate Power Purchase Agreement
"I need an Austrian-law Corporate Power Purchase Agreement for a 15-year term starting March 2025, where my manufacturing company will purchase 50MW of wind power annually from a new wind farm in Burgenland, with guaranteed minimum output provisions and sustainability reporting requirements."
1. Parties: Identification and details of the contracting parties (Generator/Seller and Corporate Buyer)
2. Background: Context of the agreement, including facility details and parties' objectives
3. Definitions: Defined terms used throughout the agreement
4. Sale and Purchase Obligations: Core obligations regarding electricity supply and purchase, including volume commitments
5. Term and Termination: Duration of the agreement, conditions for extension, and termination rights
6. Price and Payment: Pricing structure, payment terms, invoicing, and settlement procedures
7. Metering and Documentation: Requirements for measuring and recording electricity delivery
8. Delivery Point and Risk Transfer: Specification of where electricity is delivered and risk/title passes
9. Generation Facility: Specifications and requirements for the power generation facility
10. Representations and Warranties: Standard and specific warranties from both parties
11. Force Majeure: Definition and consequences of force majeure events
12. Change in Law: Procedures for handling regulatory changes affecting the agreement
13. Liability and Indemnification: Allocation of risks and liability between parties
14. Dispute Resolution: Procedures for resolving disputes, including jurisdiction and governing law
15. Confidentiality: Protection of confidential information
16. Miscellaneous: Standard boilerplate provisions including notices, amendments, and assignment
1. Green Certificates and Environmental Benefits: Provisions regarding renewable energy certificates and environmental attributes, used when specifically trading these attributes
2. Grid Connection and Transmission: Detailed provisions about grid responsibilities, included when grid connection is part of the seller's scope
3. Development and Construction: Include for projects not yet operational, covering construction milestones and requirements
4. Credit Support: Requirements for guarantees or other credit support, included for parties requiring additional security
5. Insurance: Specific insurance requirements, included when standard insurance provisions need enhancement
6. Forecasting and Scheduling: Detailed provisions about power generation forecasting, included for variable renewable sources
7. Performance Guarantees: Specific performance metrics and remedies, included when guaranteed output levels are required
1. Schedule 1 - Facility Description: Technical specifications of the generation facility
2. Schedule 2 - Pricing Mechanism: Detailed pricing calculations and adjustments
3. Schedule 3 - Testing and Commissioning: Procedures for facility testing and commissioning
4. Schedule 4 - Operating Parameters: Technical and operational requirements
5. Schedule 5 - Metering Specifications: Technical requirements for metering equipment and procedures
6. Schedule 6 - Form of Direct Agreement: Standard form of direct agreement with financiers
7. Schedule 7 - Notices: Contact details and notice requirements
8. Schedule 8 - Generation Forecasting: Procedures and requirements for generation forecasting
9. Appendix A - Form of Guarantee: Template for any required parent company or bank guarantees
10. Appendix B - Insurance Requirements: Detailed insurance specifications and requirements
Authors
Affiliate
Agreement
Annual Contract Quantity
Applicable Law
Austrian Market Rules
Availability
Balancing Group
Banking Day
Base Load
Billing Period
Business Day
Change in Law
Commercial Operation Date
Commissioning
Competent Authority
Contract Price
Contract Year
Control
Credit Support
Curtailment
Delivery Point
Delivery Schedule
Development Period
Direct Agreement
Dispute
E-Control
Effective Date
Electricity
Emergency
Environmental Attributes
Event of Default
Expected Generation
Facility
Force Majeure Event
Generation License
Good Industry Practice
Governing Law
Grid
Grid Connection Agreement
Grid Connection Point
Grid Operator
Guaranteed Commercial Operation Date
Guaranteed Output
Initial Period
Insolvency Event
Installation
Interconnection Facilities
Interest Rate
Lenders
Maintenance Schedule
Market Price
Material Adverse Effect
Metering Device
Minimum Quantity
Network Loss Factor
Operating Parameters
Operational Security
Outage
Peak Hours
Performance Security
Planned Maintenance
Project
Project Documents
Prudent Operating Practice
Purchase Obligation
Reactive Power
Renewable Energy Certificates
Replacement Power
Required Permits
Scheduled Maintenance
Security Interest
Seller's Facilities
Settlement Period
Start Date
System Emergency
Take-or-Pay Obligation
Technical Specifications
Term
Termination Date
Testing Period
Transmission System
Unit Price
VAT
Recitals
Definitions
Sale and Purchase
Delivery
Term
Price and Payment
Metering
Title and Risk
Generation Facility
Grid Connection
Testing and Commissioning
Performance Standards
Maintenance
Force Majeure
Change in Law
Representations and Warranties
Covenants
Environmental Attributes
Credit Support
Insurance
Default
Termination
Liability and Indemnification
Assignment
Confidentiality
Dispute Resolution
Governing Law
Notices
Anti-Corruption
Data Protection
Taxes
Boilerplate
Forecasting
Scheduling
Balancing
Sustainability
Reporting
Audit Rights
Intellectual Property
Health and Safety
Energy & Utilities
Renewable Energy
Manufacturing
Industrial Production
Technology & Data Centers
Real Estate & Construction
Financial Services
Agriculture & Food Processing
Mining & Materials
Retail & Consumer Goods
Legal
Procurement
Sustainability
Finance
Risk Management
Operations
Environmental Compliance
Energy Trading
Project Development
Technical Operations
Corporate Strategy
Facilities Management
Chief Executive Officer
Chief Financial Officer
Energy Procurement Manager
Sustainability Director
Legal Counsel
Contract Manager
Risk Manager
Technical Director
Operations Manager
Commercial Director
Environmental Compliance Officer
Energy Trading Manager
Project Finance Manager
Facility Manager
Corporate Strategy Director
Find the exact document you need
Power Purchase Agreement
An Austrian law-governed agreement establishing terms for electricity sale and purchase between a generator and buyer, including pricing, delivery, and compliance requirements.
Power Purchase Agreement Renewable (Energy)
An Austrian law-governed agreement for the sale and purchase of renewable electricity, establishing terms for power delivery, pricing, and regulatory compliance.
Virtual PPA
Austrian law-governed Virtual Power Purchase Agreement for renewable energy procurement, structured as a financial settlement mechanism with regulatory compliance.
Green Power Purchase Agreement
Austrian-law governed agreement for long-term purchase of renewable electricity, compliant with local energy regulations and EU directives.
Corporate Power Purchase Agreement
An Austrian-law governed agreement for long-term corporate purchase of electricity, typically from renewable sources, structured under Austrian and EU energy regulations.
Physical Power Purchase Agreement
An Austrian-law governed agreement for physical delivery of electricity between a power generator and buyer, complying with local energy regulations and EU directives.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.