Construction Material Release Form
"I need a Construction Material Release Form for my Jakarta infrastructure project to document the transfer of standard construction materials (concrete and steel) from PT Supplier to our site, with planned regular releases starting March 2025."
1. Material Release Reference Number: Unique identifier for the release form for tracking and documentation purposes
2. Date and Location: Date of material release and location of handover/pickup
3. Parties: Identification of releasing party (supplier/warehouse) and receiving party (contractor/site manager)
4. Project Details: Project name, reference number, and site location where materials will be used
5. Material Description: Detailed list of materials being released including quantities, units, and specifications
6. Quality Certification: Confirmation that materials meet required Indonesian National Standards (SNI) and quality specifications
7. Authorization: Signatures and details of authorized personnel approving the release from both parties
8. Transfer Confirmation: Acknowledgment of material receipt and condition verification
1. Special Handling Instructions: Required when materials need specific handling, storage, or transportation requirements
2. Safety Data Sheets Reference: Needed for hazardous or regulated materials requiring special handling or storage
3. Third-Party Logistics Details: Include when external transportation company is involved in material delivery
4. Insurance Coverage: Required when high-value materials are being transferred or specific insurance requirements exist
5. Import Documentation Reference: Necessary for imported materials requiring customs clearance documentation
1. Schedule A - Detailed Material Specifications: Comprehensive list of materials with technical specifications, standards compliance, and batch numbers
2. Schedule B - Quality Certificates: Copies of relevant quality certificates, SNI compliance documents, and test reports
3. Schedule C - Material Inspection Report: Pre-release inspection results and condition assessment of materials
4. Appendix 1 - Photo Documentation: Photographic evidence of material condition at time of release (if required)
5. Appendix 2 - Transportation Documentation: Delivery orders, vehicle details, and routing information when applicable
Authors
Bill of Materials
Certificate of Compliance
Construction Site
Delivery Point
Effective Date
Indonesian National Standard (SNI)
Inspection Report
Material Specifications
Material Transfer
Non-conforming Materials
Point of Release
Project
Quality Control Document
Receiving Party
Release Authorization
Release Date
Releasing Party
Safety Data Sheet
Special Handling Requirements
Storage Location
Technical Specifications
Transfer Documentation
Transportation Provider
Warehouse
Quality Certification
Release Authorization
Transfer Conditions
Inspection and Acceptance
Handling Requirements
Health and Safety
Documentation Requirements
Transportation Requirements
Risk Transfer
Compliance with Standards
Material Condition
Quantity Verification
Delivery Terms
Quality Assurance
Liability
Force Majeure
Dispute Resolution
Governing Law
Signatures and Authorization
Construction
Infrastructure Development
Real Estate Development
Industrial Construction
Commercial Construction
Residential Construction
Mining Construction
Public Works
Transportation Infrastructure
Energy Infrastructure
Procurement
Quality Control
Site Operations
Logistics
Supply Chain
Project Management
Construction Operations
Warehouse Operations
Quality Assurance
Contract Administration
Project Manager
Site Supervisor
Procurement Manager
Quality Control Manager
Warehouse Supervisor
Construction Superintendent
Materials Engineer
Logistics Coordinator
Supply Chain Manager
Safety Officer
Contract Administrator
Project Engineer
Construction Manager
Inventory Controller
Quality Assurance Specialist
Find the exact document you need
Final Waiver And Release Of Lien
An Indonesian law-compliant document where a contractor acknowledges final payment and waives rights to place property liens under Indonesian Civil Code and Construction Services Law.
Lien Waiver Release Form
An Indonesian law-compliant document that formally releases a lien holder's claim rights against property or project upon receipt of payment.
Subcontractor Waiver And Release Form
An Indonesian law-compliant form where a subcontractor waives rights and claims related to completed and paid work on a construction project.
Material Waiver Form
An Indonesian law-compliant waiver document for material handling risks and liability, incorporating bilingual requirements and safety protocols.
Construction Lien Release Form
An Indonesian law-compliant document for releasing construction liens and security interests upon payment for construction services or materials.
Affidavit Of Release Of Liens
A notarized sworn statement under Indonesian law declaring the release of lien rights over specified property or assets.
Mechanics Lien Release Form
An Indonesian legal document that releases a contractor's or supplier's right to place a lien on a property for unpaid work or materials, governed by Indonesian Construction Services Law.
Contractor Lien Waiver Form
An Indonesian legal document where contractors waive their right to place property liens in exchange for payment, governed by Indonesian Civil Code and Construction Services Law.
Contractor Lien Release Form
An Indonesian law-compliant document where a contractor releases their right to place a lien on a property upon receiving payment for construction work.
Construction Material Release Form
An Indonesian-compliant form for documenting and authorizing the release of construction materials from suppliers to construction sites, ensuring regulatory compliance and proper material transfer documentation.
Final Waiver Of Lien Form
An Indonesian legal document where a contractor or supplier waives their right to file a lien on a property after receiving full payment, governed by Indonesian civil law and construction regulations.
Conditional Waiver And Release On Progress Payment
An Indonesian law-compliant document that conditionally releases construction lien rights and claims upon receipt of progress payment.
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.