Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Emission Waiver
Need to draft an Emission Waiver for our chemical processing facility in Tuen Mun, Hong Kong, requesting temporary relief from sulfur dioxide emission standards from January 1, 2025, to June 30, 2025, while we upgrade our scrubber systems.
1. Parties: Identification of the grantor (typically the Environmental Protection Department) and the recipient of the waiver
2. Background: Context of the waiver request, including facility details and current emission circumstances
3. Definitions: Key terms used in the waiver, including technical parameters and regulatory references
4. Scope of Waiver: Specific emissions or requirements being waived, including precise parameters and limitations
5. Duration: Period for which the waiver is valid, including start and end dates
6. Conditions Precedent: Conditions that must be met before the waiver becomes effective
7. Compliance Requirements: Ongoing obligations and alternative compliance measures during the waiver period
8. Monitoring and Reporting: Requirements for emission monitoring and reporting during the waiver period
9. Modification and Termination: Circumstances under which the waiver may be modified or terminated
10. Governing Law and Jurisdiction: Confirmation of Hong Kong law governance and jurisdiction
1. Emergency Protocols: Required for waivers involving potential emergency situations or upset conditions
2. Alternative Technology Implementation: Included when the waiver is contingent on implementing alternative emission control technologies
3. Public Notice Requirements: Required when public notification of the waiver is necessary
4. Special Operating Conditions: Included when specific operational restrictions apply during the waiver period
5. Financial Security: Required when financial guarantees or bonds must be posted
6. Stakeholder Consultation: Included when the waiver requires consultation with affected parties or communities
1. Schedule 1: Technical Specifications: Detailed technical parameters of the emissions being waived, including measurement methods and threshold values
2. Schedule 2: Monitoring Requirements: Specific requirements for monitoring equipment, frequency of monitoring, and calibration requirements
3. Schedule 3: Reporting Templates: Standard forms and templates for required periodic reporting
4. Schedule 4: Site Plans: Facility layout and emission point locations
5. Appendix A: Compliance History: Historical compliance record and previous relevant waivers
6. Appendix B: Alternative Compliance Measures: Detailed description of alternative compliance measures to be implemented during the waiver period
7. Appendix C: Risk Assessment: Assessment of environmental and health risks associated with the waiver
Authors
Approved Monitoring Equipment
Alternative Compliance Measures
Authorized Officer
Background Concentration
Best Practicable Means
Compliance Period
Critical Emission Level
Director
Effective Date
Emission
Emission Control Equipment
Emission Limit Value
Emission Point
Emergency Condition
Environmental Protection Department
Facility
Force Majeure Event
Good Industry Practice
Hazardous Air Pollutant
Licensed Technical Officer
Monitoring Data
Monitoring Plan
Normal Operating Conditions
Notice
Operating Hours
Permitted Installation
Premises
Prescribed Process
Quality Assurance System
Reference Conditions
Regulatory Authority
Relevant Standard
Reporting Period
Specified Process
Stack
Standard Operating Procedures
Technical Memorandum
Temporary Exceedance
Upset Condition
Waiver Period
Working Day
Grant of Waiver
Duration and Renewal
Compliance Requirements
Monitoring and Reporting
Technical Specifications
Operating Conditions
Emergency Procedures
Record Keeping
Inspection Rights
Modification
Suspension and Termination
Force Majeure
Notice Requirements
Public Disclosure
Alternative Compliance Measures
Risk Management
Environmental Protection
Regulatory Compliance
Representations and Warranties
Indemnification
Liability
Insurance
Dispute Resolution
Governing Law
Assignment
Severability
Entire Agreement
Amendments
Confidentiality
Manufacturing
Power Generation
Chemical Processing
Waste Management
Industrial Processing
Construction
Mining and Resources
Transportation and Logistics
Marine Operations
Petrochemical
Legal
Environmental Compliance
Operations
Regulatory Affairs
Environmental Health and Safety
Sustainability
Risk Management
Quality Assurance
Facility Management
Corporate Affairs
Environmental Compliance Manager
Operations Director
Facility Manager
Environmental Health and Safety Officer
Technical Director
Legal Counsel
Chief Operations Officer
Environmental Engineer
Regulatory Affairs Manager
Sustainability Officer
Plant Manager
Quality Assurance Manager
Risk Management Officer
Corporate Environmental Director
Find the exact document you need
Download our whitepaper on the future of AI in Legal
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our Trust Centre for more details and real-time security updates.
Read our Privacy Policy.