Reviewing Construction Contracts for ADA in Construction Compliance Gaps
Construction projects involve multiple layers of legal and regulatory obligations, and one of the most critical areas of compliance concerns the Americans with Disabilities Act. When reviewing construction contracts, identifying and addressing ADA in construction compliance gaps can protect your organization from costly litigation, project delays, and reputational damage. This article provides practical guidance for business professionals responsible for managing construction contracts and mitigating compliance risks.
Understanding ADA Requirements in Construction Projects
The Americans with Disabilities Act establishes accessibility standards for commercial facilities, public accommodations, and state and local government buildings. For construction projects, these requirements apply to new construction, alterations, and renovations. The ADA Standards for Accessible Design provide detailed technical specifications covering elements such as parking spaces, entrances, restrooms, signage, and accessible routes throughout a facility.
Construction contracts must clearly allocate responsibility for ADA compliance among the various parties involved in a project. Ambiguity in these contractual provisions creates gaps that can lead to non-compliant work, disputes over who bears the cost of corrections, and potential liability for building owners and contractors alike.
Common Compliance Gaps in Construction Contracts
Several recurring issues appear when reviewing construction contracts for ADA compliance gaps. First, many contracts fail to explicitly assign responsibility for ensuring that designs and construction work meet current ADA standards. When the contract simply requires work to be performed in accordance with "applicable laws" without specific reference to ADA requirements, disputes often arise about the scope of that obligation.
Second, contracts frequently lack clear provisions about who bears the cost of correcting non-compliant work. If a building inspector identifies ADA violations during construction or upon completion, the financial responsibility for remediation may be unclear. This uncertainty becomes particularly problematic when multiple parties, including general contractors, subcontractors, architects, and engineers, have contributed to the non-compliant condition.
Third, indemnification clauses may not adequately address ADA-related claims. Standard indemnification language might not encompass the full range of potential ADA liabilities, including claims by individuals alleging discrimination, enforcement actions by the Department of Justice, or state and local accessibility claims that may exceed federal requirements.
Key Contract Provisions to Review and Strengthen
When reviewing construction contracts for ADA compliance, focus on several critical provisions. The scope of work section should explicitly reference ADA compliance requirements and identify which version of the ADA Standards for Accessible Design applies to the project. Given that accessibility standards have been updated over time, specifying the applicable version eliminates potential confusion.
Representations and warranties should include specific statements from contractors and design professionals confirming their familiarity with ADA requirements and their commitment to performing work in compliance with those standards. These provisions create a contractual foundation for holding parties accountable if compliance issues arise.
The contract should clearly delineate compliance responsibilities across different project phases. During design, architects and engineers should bear responsibility for creating ADA-compliant plans and specifications. During construction, general contractors should be responsible for executing the work according to those compliant designs, while subcontractors should be accountable for their specific scope of work. When using a Main Contractor And Subcontractor Agreement, ensure that ADA compliance obligations flow down explicitly to all subcontractors.
Allocating Risk Through Insurance and Indemnification
Construction contracts should address ADA-related risks through carefully drafted insurance and indemnification provisions. Insurance requirements should specify that general liability policies cover ADA compliance claims and that professional liability policies for design professionals include coverage for accessibility-related errors and omissions.
Indemnification clauses should explicitly address ADA claims. Consider language that requires contractors to indemnify the owner for claims arising from the contractor's failure to comply with ADA requirements in performing the work. Similarly, design professionals should indemnify the owner for claims arising from non-compliant designs. These provisions should survive project completion, as ADA claims may arise years after construction is finished.
Inspection, Testing, and Certification Requirements
Building inspection and certification processes into your construction contracts helps identify compliance gaps before project completion. Contracts should require periodic ADA compliance inspections by qualified professionals during construction, not just at the end of the project. Early identification of issues allows for less expensive corrections while work is ongoing.
Consider requiring contractors to provide certification upon project completion that all work has been performed in compliance with ADA standards. Some contracts also require contractors to engage independent accessibility consultants to verify compliance before final payment is released. While this adds cost to the project, it provides valuable assurance and creates a record of due diligence.
Documentation and Record-Keeping Obligations
Proper documentation is essential for demonstrating compliance efforts and defending against potential claims. Construction contracts should require contractors to maintain detailed records of how ADA requirements were addressed throughout the project. This includes submittals showing that specified materials and equipment meet accessibility standards, inspection reports, testing results, and any correspondence regarding ADA compliance issues.
Contracts should also specify how long these records must be retained and who has access to them. Given that ADA claims can be brought years after construction is completed, retention periods of at least seven to ten years are advisable.
Addressing Changes and Modifications
Construction projects frequently involve changes to the original scope of work through change orders and modifications. Contracts should establish a clear process for evaluating whether proposed changes affect ADA compliance. Any change order should include a representation that the modified work will comply with ADA requirements, and the contract should prohibit changes that would create compliance gaps.
When reviewing change orders, consider whether the modification affects accessible routes, accessible parking, accessible entrances, or other key accessibility features. Even seemingly minor changes can create compliance issues if they are not properly evaluated.
Remedies and Dispute Resolution
Construction contracts should specify remedies available if ADA compliance gaps are discovered. These might include the right to require the contractor to correct non-compliant work at no additional cost to the owner, the right to hire another contractor to perform corrections and charge the cost back to the original contractor, or the right to withhold payment until compliance is achieved.
Dispute resolution provisions should address how ADA compliance disputes will be handled. Some contracts require disputes to be resolved through arbitration or mediation before litigation can be pursued. Consider whether these alternative dispute resolution mechanisms are appropriate for ADA compliance issues, as some claims may require court intervention for effective resolution.
Practical Steps for Contract Review
When reviewing construction contracts for ADA compliance gaps, follow a systematic approach. Begin by identifying all parties involved in the project and their respective responsibilities. Create a matrix showing which party is responsible for each aspect of ADA compliance, from initial design through final inspection.
Review the following specific contract elements:
First, examine the scope of work and technical specifications to confirm they reference current ADA standards. Second, verify that representations and warranties explicitly address ADA compliance. Third, review insurance requirements to ensure adequate coverage for accessibility claims. Fourth, assess indemnification provisions to confirm they encompass ADA-related liabilities. Fifth, check that inspection and certification requirements will identify compliance issues before project completion.
Also consider the following practical questions:
Does the contract identify who will monitor ADA compliance during construction? Is there a process for addressing compliance questions that arise during the project? Are there consequences for failing to meet ADA requirements? Does the contract require compliance with state and local accessibility requirements that may exceed federal ADA standards?
Coordinating with Other Project Documents
Construction contracts do not exist in isolation. They must be coordinated with other project documents, including architectural and engineering plans, specifications, permits, and financing agreements. Review these documents together to ensure consistency in how ADA requirements are addressed.
Pay particular attention to any conflicts between contract terms and other project documents. For example, if plans show features that do not meet ADA standards but the contract requires ADA compliance, this conflict must be resolved before construction begins. Establish a clear hierarchy of documents in the contract so that if conflicts arise, there is a defined process for resolution.
Managing Ongoing Compliance After Project Completion
ADA compliance does not end when construction is completed. Contracts should address ongoing obligations such as warranty periods during which contractors remain responsible for correcting compliance defects. Consider including provisions that require contractors to cooperate with any post-completion accessibility surveys or audits and to provide information needed to address any identified issues.
For projects involving phased construction or tenant improvements, contracts should address how ADA compliance will be maintained as additional work is performed. Subsequent construction should not compromise accessibility features installed in earlier phases.
Reviewing construction contracts for ADA in construction compliance gaps requires attention to detail and a thorough understanding of both accessibility requirements and contract risk allocation principles. By systematically addressing the areas outlined in this article, business professionals can strengthen their construction contracts, reduce compliance risks, and protect their organizations from the significant costs associated with ADA violations. Taking time to identify and close compliance gaps during contract review is far more efficient than addressing these issues through litigation or costly post-construction remediation.
What documentation should you require to prove ADA compliance during construction projects?
To verify ADA compliance during construction, require contractors to provide certified accessibility plans reviewed by a qualified accessibility consultant or architect. Demand periodic inspection reports from third-party ADA specialists confirming adherence to federal standards at key project milestones. Request detailed as-built drawings documenting accessible routes, ramp slopes, door widths, and restroom dimensions. Include compliance certificates from licensed inspectors upon project completion. Your Main Contractor And Subcontractor Agreement should explicitly require these deliverables and establish clear accountability. Obtain warranties guaranteeing all work meets ADA Standards for Accessible Design. Maintain photographic evidence of compliant installations. These documents protect your organization from future claims, facilitate regulatory approvals, and demonstrate due diligence if accessibility issues arise after project completion.
How do you handle change orders when ADA compliance issues are discovered mid-project?
When ADA compliance gaps surface during construction, handling change orders requires clear documentation and prompt action. First, assess whether the original contract assigned responsibility for ADA compliance to the contractor or owner. Review your Main Contractor And Subcontractor Agreement to determine liability allocation. Document the discovered issue immediately with photographs, specifications, and cost estimates. Issue a formal change order that details the scope of remedial work, pricing adjustments, and timeline impacts. Ensure the change order references applicable ADA standards and includes language protecting your organization from future non-compliance claims. Consider whether the issue stems from design errors, construction defects, or changed regulations, as this affects cost allocation. Always obtain written approval from all stakeholders before proceeding with corrective work to avoid disputes over payment responsibility.
What insurance requirements should you include to cover ADA-related claims in construction contracts?
Your construction contracts should mandate comprehensive general liability insurance with minimum coverage of two million dollars, specifically including bodily injury and property damage related to accessibility failures. Require contractors to name your company as an additional insured and ensure policies explicitly cover ADA compliance claims. Include professional liability insurance for architects and designers who create accessibility plans. When drafting a Main Contractor And Subcontractor Agreement, verify that subcontractors carry equivalent coverage and provide certificates of insurance before work begins. Mandate that all policies remain active through project completion plus an extended reporting period. Consider requiring contractors to maintain completed operations coverage for claims arising after project delivery, as ADA violations may not surface immediately.
Genie AI: The Global Contracting Standard
At Genie AI, we help founders and business leaders create, review, and manage tailored legal documents - without needing a legal team. Whether you're drafting documents, negotiating contracts, reviewing terms, or scaling operations whilst maintaining a lean team, Genie's AI-powered platform puts trusted legal workflows at your fingertips. Try Genie today and move faster, with legal clarity and confidence.