Contractor Method Statement for Denmark
Create a bespoke document in minutes, or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Contractor Method Statement
I need a Contractor Method Statement for a wind turbine maintenance project in Esbjerg, Denmark, starting March 2025, involving working at heights and specialized lifting operations.
Your data doesn't train Genie's AI
You keep IP ownership of your information
1. Project Information: Details of the project, location, client, and contractor information
2. Scope of Works: Detailed description of the work activities covered by this method statement
3. Risk Assessment Reference: Reference to associated risk assessments and key hazards identified
4. Personnel: Details of key personnel, their roles, responsibilities, and qualifications
5. Work Methodology: Step-by-step description of how the work will be carried out
6. Equipment and Materials: List of equipment, tools, and materials to be used, including specifications
7. Safety Measures: Specific safety controls and measures to be implemented
8. Personal Protective Equipment: Required PPE for different activities
9. Environmental Protection: Measures to protect the environment and manage waste
10. Emergency Procedures: Emergency response procedures and contact information
1. Noise Management: Required when work involves significant noise generation in sensitive areas
2. Traffic Management: Needed when work affects public roads or requires vehicle movements
3. Working at Height: Required for any activities involving work at height
4. Confined Space Entry: Necessary when work involves entering confined spaces
5. Lifting Operations: Required for work involving cranes or other lifting equipment
6. Hazardous Substances: Needed when work involves use of dangerous materials
7. Temporary Works: Required when temporary structures or supports are needed
8. Permit to Work Requirements: For high-risk activities requiring specific permits
1. Risk Assessment: Detailed risk assessment for the specific work activities
2. Equipment Certificates: Copies of inspection certificates for key equipment
3. Training Records: Relevant training certificates for personnel
4. Site Layout Plan: Drawings showing work areas, access routes, and safety facilities
5. Emergency Contact List: List of emergency contacts and procedures
6. COSHH Assessments: Assessment sheets for hazardous substances
7. Inspection Checklists: Daily/weekly inspection forms for equipment and work areas
8. Toolbox Talk Records: Templates and records of safety briefings
Authors
COSHH
Competent Person
Contractor
Control Measures
Danish Working Environment Act
Emergency Procedures
Hazard
Hot Work
Incident
Method Statement
Near Miss
Permit to Work
Personal Protective Equipment (PPE)
Principal Contractor
Project Manager
Risk Assessment
Safety Data Sheet
Safety Representative
Site Manager
Site Rules
Sub-contractor
Supervisor
Task
Temporary Works
Work Area
Work Equipment
Work at Height
Working Environment
Workplace
Work Description
Risk Assessment
Safety Procedures
Personnel Requirements
Equipment and Materials
Method of Work
Environmental Protection
Emergency Procedures
Monitoring and Supervision
Personal Protective Equipment
Site Access
Training Requirements
Quality Control
Reporting and Documentation
Hazardous Materials Management
Communication Procedures
Inspection Requirements
Workplace Layout
First Aid Arrangements
Construction
Infrastructure
Manufacturing
Industrial
Energy
Utilities
Marine
Transportation
Telecommunications
Mining and Resources
Oil and Gas
Renewable Energy
Health Safety Environment
Operations
Project Management
Quality Assurance
Risk Management
Construction
Engineering
Compliance
Site Operations
Technical Services
Project Manager
Health and Safety Manager
Site Supervisor
Construction Manager
Safety Coordinator
Operations Manager
Risk Manager
Environmental Compliance Officer
Quality Control Manager
Technical Director
Works Manager
Contract Manager
HSE Advisor
Project Engineer
Find the exact document you need
Contractor Method Statement
A detailed work procedure and safety document compliant with Danish workplace safety regulations, outlining specific methods and control measures for contractor activities.
Genie’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; Genie’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it