Construction Phase Plan Template for England and Wales

Create a bespoke document in minutes, or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your document

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Construction Phase Plan

"I need a construction phase plan for a residential project in London, detailing health and safety measures, risk assessments, and timelines, with a budget not exceeding £500,000. Include roles and responsibilities for all contractors and ensure compliance with UK regulations."

What is a Construction Phase Plan?

A Construction Phase Plan sets out the health and safety arrangements for any building project in England and Wales. It's a legal requirement under the Construction (Design and Management) Regulations 2015, with the principal contractor typically responsible for creating and maintaining it throughout the work.

The plan spells out key safety measures, site rules, emergency procedures, and specific controls for high-risk activities. It must be tailored to each project's unique challenges and kept up-to-date as work progresses. For smaller jobs, it can be quite simple, while larger projects need more detailed plans covering everything from traffic management to worker welfare facilities.

When should you use a Construction Phase Plan?

You need a Construction Phase Plan before starting any construction work in England and Wales - from small home renovations to major commercial builds. The law requires it as soon as you move from planning to actual construction, with different levels of detail based on project size and complexity.

For simple jobs like installing a new kitchen, a basic plan works fine. But larger projects need comprehensive plans covering multiple contractors, complex safety arrangements, and site-specific risks. The key is having it ready before workers arrive on site, then updating it as the project evolves and new risks emerge.

What are the different types of Construction Phase Plan?

  • Basic Site Plans: Suitable for small residential projects or minor commercial works, covering essential safety measures and site rules
  • Medium-Scale Construction Phase Plans: Used for mid-sized builds, including detailed risk assessments and contractor coordination
  • Complex Project Plans: For large commercial developments, featuring comprehensive safety systems, multiple contractor management, and detailed emergency procedures
  • Specialist Works Plans: Tailored for high-risk activities like demolition or working at height, with additional safety controls
  • Design-Build Plans: Specifically structured for projects where design work continues during construction, requiring regular updates

Who should typically use a Construction Phase Plan?

  • Principal Contractors: Legally responsible for creating and maintaining the Construction Phase Plan, ensuring it reflects current site conditions
  • Project Managers: Oversee the plan's implementation and coordinate updates as work progresses
  • Site Supervisors: Use the plan daily to manage safety procedures and ensure worker compliance
  • Construction Workers: Must follow the safety measures and site rules outlined in the plan
  • Health and Safety Inspectors: Review the plan during site visits to verify compliance with regulations
  • Clients: Review and approve the plan, ensuring it adequately protects their interests and meets legal requirements

How do you write a Construction Phase Plan?

  • Project Details: Collect basic information about the construction work, including scope, location, and timeline
  • Risk Assessment: Identify and evaluate all potential site hazards and specific work-related risks
  • Site Rules: Define clear safety procedures, access controls, and working hours
  • Emergency Planning: Document procedures for accidents, fires, and other emergency situations
  • Worker Welfare: Detail facilities, first aid arrangements, and rest areas
  • Communication: Establish channels for sharing safety information and reporting incidents
  • Review Process: Set up a system for regular plan updates as work progresses

What should be included in a Construction Phase Plan?

  • Project Description: Key details about the construction work, site location, and timeline
  • Management Structure: Clear outline of roles, responsibilities, and chain of command
  • Risk Controls: Specific measures to address identified site hazards and work-related risks
  • Site Rules: Comprehensive safety procedures, access restrictions, and working hours
  • Emergency Procedures: Detailed response plans for accidents and incidents
  • Welfare Arrangements: Facilities and provisions for workers' health and safety
  • Monitoring Systems: Methods for reviewing and updating the plan throughout construction
  • Training Requirements: Necessary qualifications and site-specific instruction needs

What's the difference between a Construction Phase Plan and a Construction Agreement?

A Construction Phase Plan often gets confused with a Construction Agreement, but they serve distinct purposes in building projects. While both relate to construction work, their focus and legal requirements differ significantly.

  • Purpose and Scope: A Construction Phase Plan focuses exclusively on health and safety management during the build, while a Construction Agreement covers the commercial and legal relationship between parties, including payment terms and project specifications
  • Legal Requirements: The Construction Phase Plan is mandatory under CDM Regulations 2015 for all construction work, but a Construction Agreement is a voluntary contract between parties
  • Timeframe: The Plan remains active and evolves throughout the construction phase, while the Agreement typically stays fixed once signed
  • Content Focus: The Plan details specific safety measures and risk controls, whereas the Agreement outlines contractual obligations, costs, and deliverables

Get our United Kingdom-compliant Construction Phase Plan:

Access for Free Now
*No sign-up required
4.6 / 5
4.8 / 5

Find the exact document you need

No items found.

Download our whitepaper on the future of AI in Legal

By providing your email address you are consenting to our Privacy Notice.
Thank you for downloading our whitepaper. This should arrive in your inbox shortly. In the meantime, why not jump straight to a section that interests you here: https://www.genieai.co/our-research
Oops! Something went wrong while submitting the form.

Genie’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; Genie’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our Trust Centre for more details and real-time security updates.